High voltage and medium voltage equipment have to be thoroughly tested before energization.
In MEngS we provide Stage I testing including not limited to:
-
Surge arrester Testing
-
Voltage Transformer testing (Including CVT)
-
Current transformer testing
-
Circuit Breaker testing
-
Disconnector switch testing
-
Power Transformer testing
-
Capacitor Bank testing
-
Switchgear testing
Stage II Testing including not limited to:
-
Current transformer continuity test
-
Voltage transformer continuity test
-
Interlocking test
-
Differential schemes stability test
Stage III test including but not limited to:
-
Directional testing
-
Differential operational testing